Here are some of the projects in which Con-Cure has played a role:

 

 

New Carquinez Bridge (I-80)

Project: New Carquinez Bridge
Location: Bay Area, California
Completion Date: Summer, 2003
Owner: California Department of Transportation
Contractor: FCI Constructors, Inc.
Description of Work: This three span, 3,465 foot long structure will be the nation's first new major suspension bridge to be built in 35 years. At bid time, it was the largest project ever awarded by Caltrans.  The bridge features two 400-foot high concrete towers, supported by driven piles. Each tower has 12 foundation piles, 3 meters in diameter by 51 meters long, with an additional 42-meter rock socket.

 

 

Back to top

 

 

 

Maumee River Crossing (I-280)

Project: Maumee River Crossing
Location: Toledo, Ohio
Completion Date: Summer, 2006
Contractor: Fru-Con Construction (Ballwin, Missouri)
Description of Work: This project involves the construction of new pre-cast concrete box girders with cable-stayed river span, adding new ramps on the structure to Front and Greenbelt, grading, pavement, drainage, adding new retaining walls, and Widening the I-280 bridge over Greenbelt.
More Project Information: Look Up, Toledo: Maumee River Crossing

 

   

Back to top

 

 

 

Creve Coeur Lake Memorial Bridge

Project: Creve Coeur Lake Memorial Park Bridge
Location: St. Louis, Missouri
Completion Date: September 2, 2002
Owner: Missouri Department of Transportation
Engineer / Consultant: Sverdrup Civil
Description of Work: This project involves the construction of two 815m long cast-in-place cantilever box girder bridges.

 

 

Back to top

 

 

 

St. Louis' Lambert Int'l. Airport Expansion

Project: Lambert Int'l. Airport Expansion

Location: St. Louis, Missouri
Completion Date: Spring, 2005
Description of Work: This project involves the construction of new runways, taxiways, airport facilities, and roadways
Website: http://www.lambertexpansion.com

 